Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 22, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: Camarines Sur 4th District Engineering Office awarded 34 of 35 recorded flood-control contracts (97.1%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (26.7 percentage points higher; binomial p = 7.3e-05), across 13 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from consistently competitive bidding or standardized cost estimates in the district.

Public record entityData not yet available
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Camarines Sur 4th District Engineering Office: contracts

34 of 35 contracts (97.1%) at ≥99.5% of ABC · peer baseline 70.4% · gap +26.7 pts · binomial p = 7.3e-5. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).

ContractTitleContractor% of ABCSource
24FG0098Construction of Flood Control System with Groundsill Package 1 at Baranagy Lamon, Goa, Cam SurSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
22FG0023Construction of Riverbank Protection along Manapot River, Tawog, Caramoan, Camarines SurIA FERRER CONST & SUPPLY100.00%DPWH
23FG0043Construction of Flood Mitigation Structure along Sagñay River, Sagñay, Camarines SurPARTIDO CONST & SUPPLY100.00%DPWH
22FG0062Construction of Flood Control Structure (sea wall) along Lamit Bay, Sipaco, Lagonoy, Camarines Sur-E A SANCHO CONST INC FORM E A SANCHO CONST100.00%DPWH
22FG0037Construction of Flood Mitigation Structure (Seawall) along Lamit Bay, Olas, Lagonoy, Camarines SurBICOL GOLDROCK CONST CORP100.00%DPWH
22FG0002Construction of Flood Mitigation Structure along Sagnay River, Sagñay, Camarines SurIA FERRER CONST & SUPPLY100.00%DPWH
22FG0046Construction/Improvement of Flood Control Structure along Sagpon River, Sta. 0+480 - Sta. 0+784.50 bothside (Upstream), Sta. 0+525 - Sta. 0+707 (L/S), Sta.0+743PARTIDO CONST & SUPPLY100.00%DPWH
24FG0065Construction of Flood Control Structure (Rangas River) along Jct. Nato-Sabang Coastal Road, Barangay Telegrafo, San Jose, Camarines SurSPRING STAR CONST AND SUPPLY100.00%DPWH
24FG0045Construction of Flood Control Structure/Seawall in Brgy. Tandoc, Siruma, Camarines SurBICOL GOLDROCK CONST CORP100.00%DPWH
23FG0054Construction of Flood Mitigation Structure along Rangas River, Brgy. Mampirao, San Jose, Camarines SurALRO CONST & DEVELOPMENT CORP100.00%DPWH
22FG0049Construction of Flood Mitigation Structure, Tigaon, Camarines SurJO20 CONST AND SUPPLY100.00%DPWH
22FG0041Construction of Flood Mitigation Structure (Seawall) along Lamit Bay, Manggogon, Lagonoy, Camarines SurE GARCIA CONST CORP FOR E GARCIA CONST100.00%DPWH
22FG0029Construction of Flood Mitigation Structure along Teres/Cagbalinad River, Garchitorena, Camarines SurHGG BUILDERS & SUPPLY100.00%DPWH
24FG0017Construction of Flood Mitigation Structure along Rangas River, Mampirao, San Jose, Camarines SurALRO CONST & DEVELOPMENT CORP100.00%DPWH
22FG0019Construction/Improvement of Flood Control Structure along Rangas River, Sta. 0+053 - Sta. 0+903.5 (downstream - Left Side), Sta. 0+034 - Sta. 0+903.5 (downsteamPARTIDO CONST & SUPPLY100.00%DPWH
23FG0077Construction of Flood Mitigation structure along Sagñay River Brgy. del Carmen, Sagñay, Camarines SurALRO CONST & DEVELOPMENT CORP100.00%DPWH
23FG0040Construction of Flood Mitigation Structure along Rangas River, Catagbacan (Phase 2), Goa, Camarines SurBICOL GOLDROCK CONST CORP100.00%DPWH
22FG0003Construction/Improvement of Flood Control Structure along Balangao River, Sta. 0+532 - Sta. 0+865 (upstream), Sta. 0+616 - Sta. 0+890 (downstream), Tigaon, CamaPARTIDO CONST & SUPPLY100.00%DPWH
23FG0041Construction of Flood Mitigation Structure along Burabod Creek, Tigaon, Camarines SurALRO CONST & DEVELOPMENT CORP100.00%DPWH
22FG0040Construction of Flood Mitigation Structure (Seawall) along Lamit Bay, San Isidro, Lagonoy, Camarines SurE GARCIA CONST CORP FOR E GARCIA CONST100.00%DPWH
24FG0051Construction of Flood Mitigation Structure along Burabod Creek, Tigaon, Camarines SurALRO CONST & DEVELOPMENT CORP100.00%DPWH
22FG0010Construction of Flood Control System of Mahaba Creek leading to Tambang River, Sitio Palayan, Brgy. Lamon, Goa, Camarines SurSPRING STAR CONST AND SUPPLY100.00%DPWH
23FG0039Construction of Flood Control System of Mahaba Creek leading to Tambang River (Phase 2), Sitio Palayan, Brgy. Lamon, Goa, Camarines SurHGG BUILDERS & SUPPLY100.00%DPWH
22FG0013Improvement of Flood Mitigation Structure along Himoragat River, Tinambac, Camarines SurSHLA CONST AND SUPPLY100.00%DPWH
22FG0061Construction of Flood Mitigation Structure (Seawall) Barangay 1 to Barangay 4, Garchitorena, Camarines SurPARTIDO CONST & SUPPLY100.00%DPWH
22FG0020Construction of Flood Mitigation Structure along Mapanag River, Sagñay, Camarines SurSTEVEN CONST & SUPPLY100.00%DPWH
22FG0039Construction of Flood Mitigation Structure (Seawall) along Lamit Bay, Balaton, Lagonoy, Camarines SurE GARCIA CONST CORP FOR E GARCIA CONST100.00%DPWH
24FG0099Construction of Flood Control System with Groundsill Package 2 at Barangay Lamon, Goa, Cam SurSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
23FG0037Construction of Flood Mitigation Structure along Baliguon River (Phase 2), Goa, Camarines SurG C I CONST AND DEV'T CORP100.00%DPWH
22FG0008Construction/Improvement of Flood Control Structure along Panagan River, Sta. 0+300 - Sta.0+600 (upstream), Sta. 0+401.05 - Sta. 0+701.05 (downstream), Tigaon, PARTIDO CONST & SUPPLY100.00%DPWH
22F00111Construction of Flood Control Structure along Culasi River (Package I), Brgys. Matacla, Bagumbayan Grande, San Juan Evangelista, San Jose and San Benito, Goa, CBICOL GOLDROCK CONST CORP100.00%DPWH
21FG0053Construction of Flood Mitigation Structure along Kulasi River, San Roque, Lagonoy, Camarines SurE A SANCHO CONST INC FORM E A SANCHO CONST100.00%DPWH
24FG0053Construction of Flood Control Structure in Cagliliog, Tinambac, Camarines SurSPRING STAR CONST AND SUPPLY100.00%DPWH
22F00110Construction of Flood Control Structure along Culasi River (Package II), Brgy. Taytay, Goa, Camarines SurBICOL GOLDROCK CONST CORP100.00%DPWH
24FG0058Construction of Flood Mitigation Structure along Rangas River, Pugay, San Jose, Camarines SurPARTIDO CONST & SUPPLY96.83%DPWH

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Completion schedule is shown for project and contractor flags only.

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Implementing office awards near-ABC contracts far more often than the flood-control baseline

{
  "office": "Camarines Sur 4th District Engineering Office",
  "nearAbc": 34,
  "trigger": "office_pattern_aggregate",
  "officeId": "ede6bf7d-a092-55c2-8028-5b8f73d2c62b",
  "threshold": 0.995,
  "binomialTailP": 0.00007270127164901248,
  "nearAbcRatePct": 97.1,
  "totalContracts": 35,
  "baselineRatePct": 70.4,
  "excessPctPoints": 26.7,
  "expectedNearAbc": 24.6,
  "baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}