Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 22, 2026

Contractor Concentration (Flood Control)

A contractor holds a very large share of flood-control contract value in a district or province.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: LLABAN CONST & SUPPLY FORMERLY: LLABAN CON received 39.6% (₱720.61M of ₱1.82B) of recorded flood-control contract value in Cotabato 2nd District Engineering Office across 33 contracts and 9 contractors, at or above the 25% share threshold (HHI 0.236). This may be due to the contractor's specialization or limited competition in the area.

Public record entityLLABAN CONST & SUPPLY FORMERLY: LLABAN CONOrganization record →
LocationCotabato 2nd District Engineering Office
Amount₱720,612,362.3539.6% of peer-group contract value in public records sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Flagged peer group: Cotabato 2nd District Engineering Office

Reported complete (DPWH): 14Ongoing: 0Delayed: 0Status unknown: 0
Show 8 more projects in this bucket
Construction of Flood Control Dike along Bulatukan River Sta. 63+370 - Sta. 63+710 L/S, Barangay Kisante, Makilala, Cotabato24MC0032100%December 4, 2024December 2, 2024—completedsumbong source
Construction of Flood Control Dike along Bulatukan River, Sta. 61+930 - Sta. 62+270 R/S, Barangay New Bulatukan, Makilala, Cotabato24MC0034100%December 4, 2024December 4, 2024—completedsumbong source
Construction of Flood Control Dike along Bulatukan River, Sta. 62+270 - Sta. 62+610 R/S, Barangay New Bulatukan, Makilala, Cotabato24MC0035100%December 4, 2024December 3, 2024—completedsumbong source
Construction of Meocan CIS Prop Protection Dike at Arakan River, Arakan, Cotabato24MC0037100%November 27, 2024September 10, 2024—completedsumbong source
Construction of Revetment along Kabacan River (Alegria Section) Brgy. Alegria, President Roxas, North Cotabato22MC0016100%January 23, 2023January 23, 2023—completedsumbong source
Construction of Revetment along Malasila River, Sta. 36+540 - Sta. 37+340 L/S, Barangay Dagupan, Makilala, Cotabato24MC0050100%January 30, 2025February 17, 2025—completedsumbong source
Construction of Revetment along Malasila River, Sta. 41+533 - Sta. 42 + 333 R/S, Barangay Sta. Filomina, Makilala, Cotabato24MC0052100%December 4, 2024November 21, 2024—completedsumbong source
Construction of Revetment along Malasila River, Sta. 43+980 - Sta. 44+780 L/S, Barangay Sta. Filomina, Makilala, Cotabato24MC0053100%December 4, 2024November 21, 2024—completedsumbong source

Rule Definition

Share of contract value by contractor within DEO or province; flags top share > 40% or elevated HHI.

Triggering Data & citations

Contractor holds a large share of flood-control contract value in its district/province

{
  "hhi": 0.23555214999667962,
  "scope": "deo",
  "bucketKey": "deo:Cotabato 2nd District Engineering Office",
  "contractor": "LLABAN CONST & SUPPLY FORMERLY: LLABAN CON",
  "thresholds": {
    "share": 0.25,
    "minContracts": 3,
    "minBucketContracts": 10
  },
  "bucketTotalPhp": 1818330146.04,
  "contractorShare": 0.39630446864633784,
  "contractorTotalPhp": 720612362.35,
  "contractorContracts": 14
}

Possible Innocent Explanations

  • This may be due to the contractor's specialization or limited competition in the area.