Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 4 contracts awarded to ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP by the same office started within 4 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 4 in the same municipality. These may be separate flood control works at different locations within the municipality, each requiring its own contract.

Public record entityConstruction of Flood Control Structure along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 1, Nueva Era, Ilocos Norte
LocationNUEVA ERA (ILOCOS NORTE), ILOCOS NORTE, Region IContract 22AB0086
Amount₱48,999,996.76 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 1, Nueva Era, Ilocos Norte22AB0086Flood control100%December 12, 2022December 6, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 25, 2022 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Ilocos Norte 2nd District Engineering Office",
  "contractId": "22AB0086",
  "contractor": "ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP",
  "windowDays": 120,
  "clusterSize": 4,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48999996.76,
  "averageTitleSimilarity": 0.9222754184696821
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos NorteBannaBalioeg
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Active fault3.7 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.