Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22NG0040 and 23NG0043 have near-identical descriptions about 549 m apart (funding years 2022, 2023; ₱19.42M, ₱96.50M). Worth checking whether they cover the same works. This may be a legitimate continuation or expansion of the original project in the same area.

Public record entityConstruction of Flood Control in Barangay Masgad, Malimono, Surigao del Norte
LocationMALIMONO (SURIGAO DEL NORTE), SURIGAO DEL NORTE, Region XIIIContract 22NG0040
Amount₱19,419,790.50 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control in Barangay Masgad, Malimono, Surigao del Norte22NG0040Flood control100%May 5, 2023July 1, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 24, 2022 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "22NG0040",
  "fundingYear": 2022,
  "municipality": "MALIMONO (SURIGAO DEL NORTE)",
  "distanceMeters": 548.9551620790953,
  "titleSimilarity": 1
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately
  • This may be a legitimate continuation or expansion of the original project in the same area.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Surigao del NorteMalimonoMasgad
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active fault5.2 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →