Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24PA0114 lists a cost of ₱49.00M, 1.55% above its Approved Budget for the Contract of ₱48.25M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a data entry error or a late adjustment to the ABC not reflected in the published records.

Public record entityConstruction of Malabbaga Flood Control Structure, Malabbaga, La Paz, Abra
LocationLA PAZ (ABRA), ABRA, Cordillera Administrative RegionContract 24PA0114
Amount₱48,997,499.86101.55% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Malabbaga Flood Control Structure, Malabbaga, La Paz, Abra24PA0114Flood control100%October 1, 2024September 18, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 17, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Abra District Engineering Office",
  "ratio": 1.0154922250777203,
  "abcPhp": 48250000,
  "threshold": 0.995,
  "contractId": "24PA0114",
  "contractor": "MG SAMIDAN CONST",
  "contractCostPhp": 48997499.86
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to a data entry error or a late adjustment to the ABC not reflected in the published records.

Cite this record

Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Malabbaga Flood Control Structure, Malabbaga, La Paz, Abra.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/407853be-95b4-451b-8252-a65218ca81a7

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)AbraLa PazMalabbaga
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Active fault3.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.