Duplicate or Near-Duplicate Projects
Very similar descriptions within ~100m or identical coordinates across contracts/years.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contracts 22A00123 and 23A00255 have near-identical descriptions about 1414 m apart (funding years 2022, 2023; ₱28.95M, ₱46.81M). Worth checking whether they cover the same works. It is possible that the second contract is a continuation or extension of the first project, or covers a nearby stretch of the same river.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Sta. Maria River (Package 2), Sta. Maria, Ilocos Sur23A00255Flood control | 100% | October 27, 2023 | December 2, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: April 5, 2023 · Source fetched October 21, 2026
Rule Definition
Title similarity + distance or shared coordinates within municipality.
Triggering Data & citations
Similar project description near another contract in the same municipality
{
"contractId": "23A00255",
"coordinates": {
"lat": 17.386126,
"lon": 120.473465
},
"municipality": "SANTA MARIA (ILOCOS SUR)",
"distanceMeters": 1414.3260432275856,
"titleSimilarity": 1
}Source documents
