Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22BH0145 was awarded at 100.00% of its ABC. Across its 15 recorded contracts, MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST was awarded at ≥99.5% of ABC 15 times (100.0%), versus 70.4% for flood-control contracts overall. This may be due to consistently precise cost estimation or competitive bidding that matches the ABC.

Public record entityConstruction of Tagaran Flood Control Project, Tagaran, Cauayan City, Isabela
LocationCITY OF CAUAYAN (ISABELA), ISABELA, Region IIContract 22BH0145
Amount₱96,498,540.53100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Tagaran Flood Control Project, Tagaran, Cauayan City, Isabela22BH0145Flood control100%June 9, 2023June 9, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 13, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Isabela 4th District Engineering Office",
  "ratio": 0.9999848759585492,
  "abcPhp": 96500000,
  "threshold": 0.995,
  "contractId": "22BH0145",
  "contractor": "MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST",
  "contractCostPhp": 96498540.53
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to consistently precise cost estimation or competitive bidding that matches the ABC.

Cite this record

Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Tagaran Flood Control Project, Tagaran, Cauayan City, Isabela.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/4783b93b-6bc5-4743-8b32-bf54aed28645

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaCity of CauayanTagaran
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Active fault23.8 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →