Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 6 contracts awarded to SILVER DRAGON CONST & LUMBER & GLASS SUPPLY INC by the same office started within 49 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 4 in the same municipality. It is possible that these are separate flood control projects for different rivers and barangays, all scheduled in the same budget cycle.

Public record entityConstruction of Waterway Structure along Sibud Creek, Bago City, Negros Occidental
LocationBAGO CITY (NEGROS OCCIDENTAL), NEGROS OCCIDENTAL, Region VIContract 22GN0058
Amount₱48,563,891.77 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Waterway Structure along Sibud Creek, Bago City, Negros Occidental22GN0058Flood control100%February 13, 2023February 13, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 31, 2022 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Negros Occidental 4th District Engineering Office",
  "contractId": "22GN0058",
  "contractor": "SILVER DRAGON CONST & LUMBER & GLASS SUPPLY INC",
  "windowDays": 120,
  "clusterSize": 6,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48563891.77,
  "averageTitleSimilarity": 0.871323786986172
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OccidentalCity of BagoPoblacion
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active fault27.3 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA1 (2.01-3 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.