Contractor Concentration (Flood Control)

A contractor holds a very large share of flood-control contract value in a district or province.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: RJIR ENT CORP received 61.0% (₱677.24M of ₱1.11B) of recorded flood-control contract value in Leyte 3rd District Engineering Office across 30 contracts and 7 contractors, at or above the 25% share threshold (HHI 0.428). This may be due to the contractor's specialization or limited competition in the area.

Public record entityRJIR ENT CORPOrganization record →
LocationLeyte 3rd District Engineering Office
Amount₱677,235,993.7061.0% of peer-group contract value in public records sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Flagged peer group: Leyte 3rd District Engineering Office

Reported complete (DPWH): 15Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure (Caigit to Pangas), Barangay Poblacion Del Norte, Villaba, Leyte24IE0036Flood control100%December 14, 2024November 25, 2024—completedsumbong source
Construction of Flood Control Structure, Barangay Jalas, Villaba, Leyte24IE0012Flood control100%December 14, 2024May 28, 2024—completedsumbong source
Construction of Flood Control Structure, Barangay Sambulawan, Leyte, Leyte23IE0019Flood control100%December 28, 2023October 3, 2023—completedsumbong source
Construction of Seawall, Sitio Kawayan, Barangay Sta. Rosa, Tabango, Leyte23IE0033Flood control100%January 7, 2024January 7, 2024—completedsumbong source
Construction of Silad Tide Embankment (Left Side), Brgy. Silad, Villaba, Leyte23IE0055Flood control100%March 3, 2024December 5, 2023—completedsumbong source
Construction of Slope Protection along the Property Line of New Villaba Municipal Building, Villaba, Leyte23IE0041Flood control100%December 25, 2023September 18, 2023—completedsumbong source
Show 9 more projects in this bucket
Construction of Suba Tide Embankment, Brgy. Suba, Villaba, Leyte23IE0049Flood control100%February 15, 2024December 5, 2023—completedsumbong source
Construction of Tide Embankment Protection, Barangay Suba, Villaba, Leyte21IE0035Flood control100%October 14, 2022September 1, 2022—completedsumbong source
Construction of Tide Protection Embankment, Barangay Silad, Villaba, Leyte24IE0038Flood control100%December 14, 2024September 17, 2024—completedsumbong source
Construction of Tide Protection Embankment, Barangay Silad, Villaba, Leyte23IE0010Flood control100%December 13, 2023August 8, 2023—completedsumbong source
Construction of Tide Protection Embankment, Brgy Silad, Villaba, Leyte22IE0062Flood control100%January 23, 2023January 23, 2023—completedsumbong source
Construction of Tide Protection Embankment, Brgy. Poblacion del Norte, Villaba, Leyte22IE0067Flood control100%April 6, 2023March 8, 2023—completedsumbong source
Construction of Tide Protection Embankment, Silad Port (Right Side), Brgy. Silad, Villaba, Leyte22IE0063Flood control100%January 23, 2023January 23, 2023—completedsumbong source
Construction of Tide Protection Embankment, Suba, Villaba, Leyte22IE0064Flood control100%April 6, 2023December 15, 2022—completedsumbong source
Repair/Rehab of the destroyed slope protection along the Project caused by Typhoon Agaton, San Antonio Homes, Brgy. Linao, San Isidro, Leyte23IE0062Flood control100%March 4, 2024January 26, 2024—completedsumbong source

Rule Definition

Share of contract value by contractor within DEO or province; flags top share > 40% or elevated HHI.

Triggering Data & citations

Contractor holds a large share of flood-control contract value in its district/province

{
  "hhi": 0.4283162326871406,
  "scope": "deo",
  "bucketKey": "deo:Leyte 3rd District Engineering Office",
  "contractor": "RJIR ENT CORP",
  "thresholds": {
    "share": 0.25,
    "minContracts": 3,
    "minBucketContracts": 10
  },
  "bucketTotalPhp": 1110977514.46,
  "contractorShare": 0.6095856890759631,
  "contractorTotalPhp": 677235993.6999999,
  "contractorContracts": 15
}

Possible Innocent Explanations