Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Agusan del Sur 1st District Engineering Office awarded 29 of 30 recorded flood-control contracts (96.7%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (26.3 percentage points higher; binomial p = 3.6e-04), across 13 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This may reflect highly competitive bidding or precise cost estimation for these projects.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Agusan del Sur 1st District Engineering Office: contracts
29 of 30 contracts (96.7%) at ≥99.5% of ABC · peer baseline 70.4% · gap +26.3 pts · binomial p = 3.6e-4. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 22NB0022 | Construction/Rehabilitation of Maytibog River Training along Agusan-Davao Road, Sta. 0+011.00 - Sta. 0+300.00, Bayugan City, Agusan del Sur | MADYAW CONST & DEV CORP | 100.00% | DPWH |
| 22NB0014 | Construction/Rehabilitation of Sinadyap River Phase II, Sta. 0+067.00 - Sta. 0+429 (L/S), Sta. 0+040.00 - Sta. 0+430.00 (R/S), Bayugan City, Agusan del Sur | ARQ BUILDERS | 100.00% | DPWH |
| 21N00141 | Construction of Bank Protection along Wawa River Protecting the National Road, along Bayugan - Esperanza Road (Crossing Luna Section), Agusan del Sur, Package | CM TAN CONST | 100.00% | DPWH |
| 22NB0032 | Construction of Revetment along Wawa River, Wawa Bridge Section, Agusan del Sur, Sta. 0+000.00 - Sta. 0+123.80, Bayugan City, Agusan del Sur | ADFIL CORP | 100.00% | DPWH |
| 21N00142 | Construction of Bank Protection Protecting the National Road, Butuan City-Esperanza-San Luis, Talacogon, Agusan del Sur, Package 2 | CM TAN CONST | 100.00% | DPWH |
| 22NB0006 | Construction of Bank Protection along Bayugan River, Sta. 0+100 - Sta. 0+349.00 (L/S), Sta. 0+110.00 - Sta. 348.00 (R/S), Bayugan City, Agusan del Sur | A T DUMLAO CONST INC FORMERLYANDONI T D | 100.00% | DPWH |
| 22NB0004 | Construction of Bank Protection of Sianib River along Daang Maharlika (Agusan-Davao Section), Sta. 0+000.00 - Sta. 0+124.00, Prosperidad, Agusan del Sur | DAVE CONST | 100.00% | DPWH |
| 22NB0009 | Construction of Flood Control Project (Boat landing) along Agusan River, Sta. 0+000.00 - Sta. 0+100.00, Esperanza, Agusan del Sur | LM CONST AND GEN MARKETING | 100.00% | DPWH |
| 22NB0041 | Construction of Bank Protection along Agusan River, Hawilian Section, Agusan del Sur | GIOVANNI CONST | 100.00% | DPWH |
| 23N00100 | Construction of Bank Protection along Wawa River, Poblacion, Sibagat, Agusan del Sur | CM TAN CONST | 100.00% | DPWH |
| 23NB0019 | Construction of Revetment along Agusan River Basin, Esperanza Section, Agusan del Sur | ADFIL CORP | 100.00% | DPWH |
| 24NB0015 | Construction of Bank Protection along Agusan River (Poblacion-Esperanza Section) Esperanza, Agusan del Sur | J M LACORTE CONST | 100.00% | DPWH |
| 22NB0010 | Construction of Maug Flood Control Structure along Riverbank of Maug Bridge Phase III (Downstream), Sta. 0+000.00 - Sta. 0+320.00 R/S, Prosperidad, Agusan del S | EQUI-PARCO CONST CO | 100.00% | DPWH |
| 22NB0021 | Construction of Patin-ay River Dike (Upstream), Sta. 0+000.00 - Sta. 0+500.00, Prosperidad, Agusan del Sur | ABADA CONST AND SUPPLY | 100.00% | DPWH |
| 22NB0005 | Construction of Bank Protection of Sianib River along Daang Maharlika (Agusan-Davao Section), Sta. 0+000.00 - Sta. 0+350.00 Upstream, Sta. 0+000.00 - Sta. 0+066 | EQUI-PARCO CONST CO | 100.00% | DPWH |
| 22NB0011 | Construction of Revetment along Agusan River Basin, Esperanza Bridge Approaches, Sta. 0+000.00 - Sta. 0+400.00, Esperanza, Agusan del Sur | ADFIL CORP | 100.00% | DPWH |
| 22NB0043 | Construction of Flood Mitigation Structures along Andanan River Bank (Upstream), Bayugan City, Agusan del Sur | CM TAN CONST | 100.00% | DPWH |
| 24NB0023 | Construction of Flood Control Project along Agusan River, Esperanza, Agusan del Sur | BBC CONST | 100.00% | DPWH |
| 22NB0013 | Construction of Azpetia River Bank Protection, Sta. 0+000.00 - Sta. 0+540.00 R/S, Sta. 0+000.00 - Sta. 0+080.00 L/S, Brgy. Azpetia, Prosperidad, Agusan del Sur | J M LACORTE CONST | 100.00% | DPWH |
| 24NB0012 | Construction of Bank Protection along Agusan River (Magtuyon Section) San Luis, Agusan del Sur | J M LACORTE CONST / LEXICON DEVELOPMENT CORP | 100.00% | DPWH |
| 22NB0042 | Construction of Bank Protection of Sianib River along Daang Maharlika, Agusan del Sur | MADYAW CONST & DEV CORP | 100.00% | DPWH |
| 23N00099 | Construction of Bank Protection along Agusan River (Dimasalang Section) San Luis, Agusan del Sur | ARQ BUILDERS | 100.00% | DPWH |
| 23NB0015 | Construction of Revetment along Gibong River, Azpetia Bridge Section, Prosperidad, Agusan del Sur | J M LACORTE CONST | 100.00% | DPWH |
| 24NB0050 | Construction of Andanan RIS Flood Control Structure, Bayugan City, Agusan del Sur | J M LACORTE CONST | 100.00% | DPWH |
| 22NB0026 | Construction of Bank Protection (Raising of Grades, protecting the National Road) along Bayugan-Esperanza Road, Crossing Luna Section, Sta. 0+000.00 - Sta. 0+10 | CM TAN CONST | 100.00% | DPWH |
| 21NB0041 | Construction of Flood Relief along Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Road - K1326+822 - K1328+985, Agusan del Sur | MADYAW CONST & DEV CORP | 100.00% | DPWH |
| 22NB0007 | Construction of Bank Protection along Wawa River (Mahagkot Section) Downstream, Phase II, Sta. 0+080.00 - Sta. 0+184.80, Ezperanza, Agusan del Sur | J M LACORTE CONST | 100.00% | DPWH |
| 22NB0055 | Construction of Bank Protection along Wawa River Protecting the National Road, along Bayugan - Esperanza Road (Crossing Luna Section), Agusan del Sur, Package | CM TAN CONST | 99.99% | DPWH |
| 22NB0054 | Construction of Bank Protection along Wawa River, Poblacion Sibagat Section, Agusan del Sur | CM TAN CONST | 99.94% | DPWH |
| 21N00083 | Construction of Revetment along Agusan River Basin, Esperanza Section, Agusan del Sur | ADFIL CORP | 99.34% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Agusan del Sur 1st District Engineering Office",
"nearAbc": 29,
"trigger": "office_pattern_aggregate",
"officeId": "a0f8fe6e-9472-5517-b08d-ef5efb668107",
"threshold": 0.995,
"binomialTailP": 0.000364156844459252,
"nearAbcRatePct": 96.7,
"totalContracts": 30,
"baselineRatePct": 70.4,
"excessPctPoints": 26.3,
"expectedNearAbc": 21.1,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents
Possible Innocent Explanations
- This may reflect highly competitive bidding or precise cost estimation for these projects.