Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 19 contracts awarded to ST TIMOTHY CONST CORP by the same office started within 96 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 9 in the same municipality. It is possible that the projects were planned separately for different locations as part of a coordinated flood control program.

Public record entityConstruction of Bua Flood Control Structure, Barangay Poblacion, Lacub, Abra
LocationLACUB (ABRA), ABRA, Cordillera Administrative RegionContract 22PA0051
Amount₱46,607,719.18 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Bua Flood Control Structure, Barangay Poblacion, Lacub, Abra22PA0051Flood control100%September 3, 2022September 3, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 1, 2022 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Abra District Engineering Office",
  "contractId": "22PA0051",
  "contractor": "ST TIMOTHY CONST CORP",
  "windowDays": 120,
  "clusterSize": 19,
  "thresholdPhp": 50000000,
  "contractCostPhp": 46607719.18,
  "averageTitleSimilarity": 0.8641703903410409
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)AbraLacubPoblacion
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Active fault22.3 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)LandslidehighUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.