Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24HE0164 was awarded at 100.00% of its ABC. Across its 88 recorded contracts, QM BUILDERS was awarded at ≥99.5% of ABC 84 times (95.5%), versus 70.4% for flood-control contracts overall. It is possible that the winning bid exactly matched the ABC due to precise cost estimation or a single bidder.

Public record entityConstruction of Revetment Wall Structure along Mananga River (Right Side), Purok Narra, Barangay Jaclupan, Talisay City, Cebu
LocationCITY OF TALISAY (CEBU), CEBU, Region VIIContract 24HE0164
Amount₱138,600,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Revetment Wall Structure along Mananga River (Right Side), Purok Narra, Barangay Jaclupan, Talisay City, Cebu24HE0164Flood control100%January 20, 2025January 20, 2025No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 4, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Cebu 1st District Engineering Office",
  "ratio": 1,
  "abcPhp": 138600000,
  "threshold": 0.995,
  "contractId": "24HE0164",
  "contractor": "QM BUILDERS",
  "contractCostPhp": 138600000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)CebuCity of TalisayMaghaway
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active fault2.2 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)LandslidehighUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.