Contractor Concentration (Flood Control)

A contractor holds a very large share of flood-control contract value in a district or province.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: QM BUILDERS received 41.0% (₱5.19B of ₱12.66B) of recorded flood-control contract value in Cebu 7th District Engineering Office across 143 contracts and 12 contractors, at or above the 25% share threshold (HHI 0.201). This may be due to the contractor's strong track record or specialization in flood-control projects in the area.

Public record entityQM BUILDERSOrganization record →
LocationCebu 7th District Engineering Office
Amount₱5,187,395,780.2641.0% of peer-group contract value in public records sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Flagged peer group: Cebu 7th District Engineering Office

Reported complete (DPWH): 40Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construcion of Storm Surge Protection Structures at Sitio Kalubihan, Brgy. Guiwanon, Ginatilan, Cebu (Package 1)23HO0188Flood control100%February 19, 2024December 11, 2023—completedsumbong source
Construction of Flood Control Structure along Polo River (Downstream Left Side), Alcantara, Cebu24HO0001Flood control100%January 10, 2025September 16, 2024—completedsumbong source
Construction of Flood Control Structure, Barangay Kantangkas (Upstream), Dumanjug, Cebu24HO0004Flood control100%December 18, 2024October 3, 2024—completedsumbong source
Construction of Flood Wall Structures along Sitio Parale (Left Side), barangay Sorsogon, Malabuyoc, Cebu23HO0002Flood control100%October 6, 2023July 21, 2023—completedsumbong source
Construction of Revetment Wall along Manlapay River (Phase 2), Dumanjug, Cebu23HO0164Flood control100%February 19, 2024December 15, 2023—completedsumbong source
Construction of Revetment Wall at Barangay Balaygtiki, Dumanjug, Cebu23HO0166Flood control100%April 21, 2024December 15, 2023—completedsumbong source
Show 34 more projects in this bucket
Construction of River Control Structures at Bgry. Ylaya - Barangay Paculob (Upstream), Dumanjug, Cebu23HO0145Flood control100%March 28, 2024March 28, 2024—completedsumbong source
Construction of River Retaining Wall at Barangay Kanguha (Right Side), Dumanjug, Cebu23HO0162Flood control100%February 19, 2024December 18, 2023—completedsumbong source
Construction of River Retaining Wall at Barangay Lanao (Left Side), Moalboal, Cebu23HO0159Flood control100%November 15, 2023November 15, 2023—completedsumbong source
Construction of River Retaining Wall at Brgy. Colabtingon (Right Side), Dumanjug, Cebu23HO0074Flood control100%January 31, 2024August 22, 2023—completedsumbong source
Construction of seawall protection along Santander - Barili-Toledo Road at Brgy. Poblacion to Brgy. Legaspi, Sta. 0+000 - Sta. 0+167, Alegria, Cebu22HO0068Flood control100%December 17, 2022December 17, 2022—completedsumbong source
Construction of Seawall Protection Works along Santander - Balili - Toledo Road, Brgy. Poblacion II, Sta. 0 + 000 - Sta. 0 + 167.00, Malabuyoc, Cebu22HO0075Flood control100%October 25, 2022October 25, 2022—completedsumbong source
Construction of Seawall Protection Works along Santander - Balili - Toledo Road, Brgy. Sto Niño, Sta. 0 + 000 - Sta. 0 + 167.00, Malabuyoc, Cebu22HO0074Flood control100%October 25, 2022October 25, 2022—completedsumbong source
Construction of Seawall Protection Works along Santander-Barili-Toledo Rd at Brgy. Felomina, Sta. 0 + 000 - Sta. 0 + 167.00, Alegria, Cebu22HO0077Flood control100%October 25, 2022October 25, 2022—completedsumbong source
Construction of Seawall Protection Works along Santander-Barili-Toledo Road at Brgy. Legaspi to Brgy. Poblacion, Sta. 0 + 000 - Sta. 0 + 167, Alegria, Cebu22HO0086Flood control100%December 17, 2022December 17, 2022—completedsumbong source
Construction of Seawall Protection Works along Santander-Barili-Toledo Road, Barangay Madridejos, Alegria, Cebu22HO0078Flood control100%October 26, 2022October 26, 2022—completedsumbong source
Construction of Storm Surge Protection Structures at Brgy. Legaspi, Alegria, Cebu (Package 3)23HO0202Flood control100%March 6, 2024September 21, 2023—completedsumbong source
Construction of Storm Surge Protection Structures at Sitio Guilongsoran, Barangay Poblacion, Ginatilan, Cebu (Package 2)23HO0199Flood control100%February 19, 2024September 25, 2023—completedsumbong source
Construction of Storm Surge Protection Structures at Sitio Guilongsoran, Brgy. Poblacion, Ginatilan, Cebu (Package 1)23HO0187Flood control100%February 19, 2024December 11, 2023—completedsumbong source
Construction of Storm Surge Protection Structures at Sitio Kasay, Barangay Looc, Ginatilan, Cebu (Package 2)23HO0203Flood control100%November 13, 2023November 13, 2023—completedsumbong source
Construction of Storm Surge Protection Structures at Sitio Lala-o, Barangay Montañeza, Malabuyoc, Cebu23HO0190Flood control100%March 6, 2024September 26, 2023—completedsumbong source
Construction of Storm Surge Protection Structures at Sitio North Suba, Barangay Looc, Malabuyoc, Cebu23HO0186Flood control100%March 6, 2024January 11, 2024—completedsumbong source
Construction of Storm Surge Protection Strucures at Sitio Balhaan, Brgy. Looc, Ginatilan, Cebu (Package 1)23HO0192Flood control100%February 4, 2024December 11, 2023—completedsumbong source
Construction of Tapon-Tangil Seawall (L/S), Sta. 0 + 000 - Sta. 0 + 181, Dumanjug, Cebu22HO0059Flood control100%November 10, 2022November 10, 2022—completedsumbong source
Construction of Tapon-Tangil Seawall, Dumanjug, Cebu22HO0005Flood control100%September 30, 2022September 26, 2022—completedsumbong source
Construction of Ylaya Flood Control (Upstream), Ylaya, Dumanjug, Cebu22HO0002Flood control100%September 26, 2022September 26, 2022—completedsumbong source
Improvement of Riverbank along Parale River, Sta. 0 + 000 - Sta. 0 + 700, Malabuyoc, Cebu22HO0048Flood control100%January 24, 2023January 24, 2023—completedsumbong source
Improvement of Riverbank along Polo River, Sta. 0 + 000 - Sta. 0 + 700, Alcantara, Cebu22HO0049Flood control100%January 24, 2023December 16, 2022—completedsumbong source
Repair/ Rehabilitation/ Reconstruction of Damaged Alegria River Flood Control System (Upstream), Alegria, Cebu, Sta. 0+000.00 to Sta. 0+252.0023HO0237Flood control100%June 8, 2024June 8, 2024—completedsumbong source
Repair/ Rehabilitation/ Reconstruction of Damaged Saliring River Flood Control System (Downstream), Malabuyoc, Cebu, Sta. 0+045 to Sta. 0+10223HO0240Flood control100%March 13, 2024December 18, 2023—completedsumbong source
Repair/ Rehabilitation/ Reconstruction of Damaged Saliring River Flood Control System (Upstream), Malabuyoc, Cebu, Sta. 0+045 to Sta. 0+16223HO0231Flood control100%May 27, 2024May 27, 2024—completedsumbong source
Repair/ Rehabilitation/ Reconstruction of Parale River Flood Control System (Downstream), Malabuyoc, Cebu, Sta. 0+000 to Sta. 0+13123HO0229Flood control100%July 3, 2024July 3, 2024—completedsumbong source
Construction of Drainage System along Brgy. Tunga, Moalboal, Cebu23HO0225100%March 16, 2024March 16, 2024—completedsumbong source
Construction of Groundsill at Montañeza River, Malabuyoc, Cebu23HO0024100%July 13, 2024July 13, 2024—completedsumbong source
Construction of Revetment Wall (Upstream) at Brgy. Tapon, Dumanjug, Cebu23HO0045100%March 30, 2024January 30, 2024—completedsumbong source
Construction of Revetment Wall along Montañeza (Upstream), Malabuyoc, Cebu23HO0025100%December 18, 2023December 18, 2023—completedsumbong source
Construction of Revetment Wall at Brgy. Tapon, Dumanjug, Cebu23HO0047100%February 16, 2024November 20, 2023—completedsumbong source
Construction of Revetment Wall with Rechannelling Works along Polo River (Upstream), Alcantara, Cebu23HO0070100%October 10, 2023August 17, 2023—completedsumbong source
Construction of Waterway along Manlapay River (Section 1), Dumanjug, Cebu22HO0060100%October 25, 2022October 25, 2022—completedsumbong source
Construction of Waterway along Tubod River (Section 1), Dumanjug, Cebu22HO0069100%October 19, 2022October 19, 2022—completedsumbong source

Rule Definition

Share of contract value by contractor within DEO or province; flags top share > 40% or elevated HHI.

Triggering Data & citations

Contractor holds a large share of flood-control contract value in its district/province

{
  "hhi": 0.20078039022568583,
  "scope": "deo",
  "bucketKey": "deo:Cebu 7th District Engineering Office",
  "contractor": "QM BUILDERS",
  "thresholds": {
    "share": 0.25,
    "minContracts": 3,
    "minBucketContracts": 10
  },
  "bucketTotalPhp": 12663827857.49,
  "contractorShare": 0.40962304909979674,
  "contractorTotalPhp": 5187395780.26,
  "contractorContracts": 71
}

Possible Innocent Explanations

  • This may be due to the contractor's strong track record or specialization in flood-control projects in the area.