Construction of Flood Control Structure along Polo River (Downstream Left Side), Alcantara, Cebu
Construction of Flood Control Structure along Polo River (Downstream Left Side), Alcantara, Cebu is a DPWH-tracked public work in ALCANTARA (CEBU), CEBU, Region VII. Reported contract value: ₱144,745,350.30. Status: Reported complete (DPWH). Contractor on record: QM BUILDERS. Figures trace to sumbong.
Total Contract Cost
