Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
8 records · ₱428,908,976.18
- Construction of Flood Control Structure Along Polo River (Downstream Left Side), Alcantara, Cebu₱144,745,350.30 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Mitigation Structure, Polo River, Phase 2, Barangay₱134,930,632.96 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Revetment Wall With Rechannelling Works Along Polo River (Upstream), Alcantara, Cebu₱48,605,990.17 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Revetment Wall Along Polo River, Brgy. Polo, Sta. 0 + 000 - Sta. 0 + 143.00, Alcantara, Cebu₱29,399,912.37 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Concreting of Brgy. Busay- Brgy. Agbalanga - Brgy. Batadbatad, Moalboal, Cebu (Package 2)₱29,238,000.00 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 1: Ensure Safe and Reliable National Road System, Bridge Program, Retrofitting/ Strengthening of Permanent Bridges, Polo Br. (B00666cb) Along Santander-Barili-Toledo Rd₱15,281,534.00 · 2023 · medium confidence (project coordinates inside the barangay boundary)
How linked: 8 by project coordinates inside the barangay boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
Not yet linked to Polo itself. This shows the municipality figure for Alcantara.
1 record · ₱420,214,312.07
- Municipality of Alcantara, Cebu₱420,214,312.07 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Polo itself. This shows the province figure for Cebu.
161,655 records · ₱506,755,681,657.63
161,308 placed at Cebu level itself; the rest in LGUs under it.
- Cebu₱506,755,681,657.63 · 161,308 awards · high confidence (area of delivery is this province only)
- Bohol, Cebu, Negros Oriental, Siquijor₱313,071,832.22 · 155 awards · low confidence (area of delivery lists several provinces)
- Bohol, Cebu, Negros Oriental₱111,569,883.99 · 53 awards · low confidence (area of delivery lists several provinces)
- Bohol, Cebu₱73,351,351.76 · 66 awards · low confidence (area of delivery lists several provinces)
- Bohol, Cebu, Siquijor₱60,193,664.40 · 25 awards · low confidence (area of delivery lists several provinces)
- Cavite, Cebu₱52,454,843.07 · 12 awards · low confidence (area of delivery lists several provinces)
How linked: 161,308 by area of delivery is this province only; 347 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
Not yet linked to Polo itself. This shows the municipality figure for Alcantara.
6 records · ₱48,208,119.00
3 placed at Alcantara level itself; the rest in LGUs under it.
- Lgsf_gef₱30,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Construction of Water System at Barangay Cabil-Isan and Barangay Palanas₱10,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Lgsf_gef₱3,900,169.00 · 2026 · high confidence (location columns in the DBM release)
- Lgsf_gef₱2,780,000.00 · 2025 · high confidence (location columns in the DBM release)
- Lgsf_gef₱1,000,000.00 · 2023 · high confidence (location columns in the DBM release)
- Lgsf_gef₱527,950.00 · 2022 · high confidence (location columns in the DBM release)
How linked: 6 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
4 records · ₱244,859,000.00
- Construction of Flood Mitigation Structure, Polo River, Phase 2, Barangay Polo, Alcantara, Cebu₱141,859,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of Revetment Wall at Polo River ( Purok Kasagingan - Purok Kabalasan ) , Barangay Polo, Alcantara, Cebu₱60,000,000.00 · 2024 · medium confidence (GAA line text names the place)
- Construction of Revetment Wall Along Polo River, Brgy. Polo, Sta. 0 + 000 - Sta. 0 + 143.00, Alcantara, Cebu₱30,000,000.00 · 2022 · medium confidence (GAA line text names the place)
- Construction of Solar Water System, Barangay Polo, Alcantara, Cebu₱13,000,000.00 · 2025 · medium confidence (GAA line text names the place)
How linked: 4 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- Contractor Concentration (Flood Control)Qm BuildersContractor: Qm Builders
- Contractor Concentration (Flood Control)Qm BuildersContractor: Qm Builders
- High Concurrent Workload for One ContractorQm BuildersContractor: Qm Builders
- Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Polo River (Downstream Left Side), Alcantara, CebuContractor: Qm Builders
- Awards Very Close to the Budget CeilingConstruction of Revetment Wall With Rechannelling Works Along Polo River (Upstream), Alcantara, CebuContractor: Qm Builders
- Awards Very Close to the Budget CeilingConstruction of Revetment Wall Along Polo River, Brgy. Polo, Sta. 0 + 000 - Sta. 0 + 143.00, Alcantara, CebuContractor: Qm Builders
Contractors on linked DPWH projects
All 4 contractors on DPWH projects linked to Polo and the LGUs under it. Click a column to sort.
| Qm Builders | 5 | ₱386,919,885.80 | 6 |
| First Grandeur Builders INC Formerly: First Grandeur Builders | 1 | ₱15,281,534.00 | 0 |
| Zion Const Formerly Masterpiece Const | 1 | ₱14,096,248.11 | 0 |
| Jrmx Const | 1 | ₱12,611,308.27 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for Polo
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.