ZION CONST FORMERLY MASTERPIECE CONST is listed as a company organization in Philippine public procurement records on this site, with 47 linked DPWH project(s) totaling about ₱1,160,501,208.18. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
ZION CONST FORMERLY MASTERPIECE CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 47
- Total value
- ₱1,160,501,208.18
- Published flags
- 0
- Region
- Cebu 4th DEO · Region VII
Public Record Grade
A transparent, data-derived summary of reported public records for ZION CONST FORMERLY MASTERPIECE CONST — not an accusation or finding of wrongdoing.
Score: 87.70 / 100 · Projects in sample: 47 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 87/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 87
- lateCompletedProjects
- 12
- onTimeCompletedProjects
- 34
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 46
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 93.6/100 · Weight: 24%
- totalProjects
- 47
- componentScore
- 93.6
- terminatedProjects
- 1
- terminationRatePct
- 2.1
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 47
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 47
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 47
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
40 geotagged projects — Open full map · Download projects (CSV)
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES TRAFFIC BENCHMARK FOR UPGRADING TO16H00045 · ₱91,669,500.00 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT, ALONG CEBU NORTH HAGNAYA WHARF ROAD K0106+000-K0108+1331, SAN REMEGIO CEBU19HD0010 · ₱59,783,680.00 · mapped
- ROAD WIDENING-CEBU NORTH HAGNAYA WHARF ROAD-K0101+700-K0103+900 BOGO CITY, CEBU18HD0021 · ₱56,452,500.00 · mapped
- CONST/REP/REHAB/IMPVT OF ROADS-CONC/IMPVT OF BRGYS. POBLACION-TAPUL-KAL-ANAN ROAD, TABOGON16HD0011 · ₱48,022,819.67
- CONST/REP/REHAB/IMPVT OF PROJECTS-CONC/IMPVT OF BRGY. MANLAGTANG-BRGY. SOMOSA ROADS, TABOGON, CEBU16HD0012 · ₱48,020,010.13
- RETROFITTING/STRENGHTHENING OF PERMANENT BRIDGES, MANANGA BRIDGE 2 (B00072CB) ALONG N. BACALSO AVE.16H00025 · ₱47,774,256.71 · mapped
- RETROFITTING/STRENTHENING OF ARGAO BRIDGE (B00022CB) ARGAO, CEBU17HG0091 · ₱46,497,640.95 · mapped
- CONST/UPGRDG/REHAB OF DRAINAGE ALONG NATIONAL ROADS, TOLEDO-TABUELAN-SAN REMIGIO ROAD, TABUELAN16HD0055 · ₱46,042,308.00 · mapped
- CONST/UPGRADING/REHAB OF DRAINAGE, CNHWR, K080+000-K080+390 & 3-OTHERS AT TABOGON & SAN REMIGIO16HD0060 · ₱45,599,225.40 · mapped
- CONST/UPGRADING/REHABILITATION OF DRAINAGE ALONG AYDPH, K0113+817-K0115+800, TABUELAN, CEBU16HD0085 · ₱45,583,915.00 · mapped
- IMPVT/WIDENING OF NATIONAL ROADS ALONG SOGOD-TABUELAN ROAD, K0109+000-K0109+920 & 1-OTHER, TABUELAN16HD0093 · ₱45,111,246.40 · mapped
- CONST/REP/REHAB/IMPVT OF LOCAL PROJECTS-CONC/IMPVT OF BRGY. MAHAWAK-DAANLUNGSOD-ANTIPOLO, MEDELLIN16HD0010 · ₱42,600,600.00
- OFF-CARRIAGEWAY IMPROVEMENT TOLEDO-TABUELAN-SAN REMEGIO ROAD, K0104+000 - K0106+000, TABUELAN, CEBU18HD0024 · ₱42,098,742.88 · mapped
- CONSTRUCTION OF FLOOD CONTROL/FACILITIES, BOGO-CURVA-MEDELLIN-DAANBANTAYAN ROAD, MEDELLIN, CEBU15HD0112 · ₱41,896,817.88
- CONSTRUCTION OF FLOOD CONTROL AND MITIGATION STRUCTURES ALONG LAHUG RIVER, BRGY. CAMPUTHAW, CEBU CITY17HH0018 · ₱40,619,765.59
- IMPVT/WIDENING OF NATIONAL ROADS ALONG SOGOD-TABUELAN ROAD (K0110+400...) TABUELAN, CEBU15HD0111 · ₱40,493,620.39 · mapped
- REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATL ROADS INCL. DRAINAGE, SOGOD-TABUELAN ROAD TABUELAN15HD0110 · ₱37,428,813.60 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT ALONG CEBU NORTH HAGNAYA WHARF ROAD CITY, K0103+900-K0105+685, BOGO AND SAN REMEGIO, CEBU18HD0023 · ₱37,044,244.27 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT CEBU NORTH HAGNAYA WHARF ROAD, K0082+000-K0083+817, TABOGON, CEBU20HD0047 · ₱34,054,020.00 · mapped
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAG15HG0189 · ₱27,222,371.28 · mapped
- WIDENING OF PERMANENT BRIDGES, ANINGAN BRIDGE (B00007CB) ALONG ANTONIO Y DE PIO H-WAY, SAN REMIGIO, CEBU21HD0110 · ₱25,186,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, COMPLETION OF MANTALONGON FLOOD CONTROL (RIVER REVETMENT), DALAGUETE, CEBU18HG0088 · ₱23,146,931.67 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE CONSTRUCTION OF FLOOD CONTROL (REVETMENT) ALONG TAYTAYAN RIVER, BARANGAY AGUJO, DAANBANTAYAN, CEBU18HD0028 · ₱19,600,000.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT LIBJO RIVER, BARANGAY LIBJO, TABOGON, CEBU ALONG CEBU NORTH HAGNAYA WHARF ROAD, BARANGAY LIBJO, TABOGON, CEBU18HD0038 · ₱19,600,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY AGUJO, DAANBANTAYAN, CEBU19HD0021 · ₱19,600,000.00 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL ROADS - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT PANGDAN BRIDGE 1, NAGA-ULING ROAD, NAGA CITY, CEBU17HE0007 · ₱15,619,250.80 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, CONSTRUCTION OF NEW PERMANENT BRIDGES, POLO BRIDGE ALONG SANTANDER-BARILI-TOLEDO ROAD18HG0125 · ₱14,096,248.11 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SOGOD-TABUELAN ROAD K0111+230-K0111+350 TABUELAN, CEBU18HD0020 · ₱13,962,250.15 · mapped
- REPAIR/REHAB. OF DAMAGED RIVER CONTROL STRUCTURES OF YLAYA BRIDGE ALONG ARGAO-RONDA ROAD, K0088+249,15HG0180 · ₱12,038,271.00
- PHASE III CONSTRUCTION OF MUNICIPAL HOSPITAL AT PILIPOG, CORDOVA, CEBU16HN0098 · ₱10,188,348.46
- CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL ROADS - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT LUTAC BRIDGE, NAGA-ULING ROAD, NAGA CITY, CEBU17HE0009 · ₱9,201,085.00 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL ROADS - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT LANAS BRIDGE, NAGA-ULING ROAD, NAGA CITY, CEBU17HE0008 · ₱9,198,392.00 · mapped
- PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) - TERTIARY ROADS - OPON-AIRPORT ROAD (S00018LP), K0036+163 - K0036+373, LAPU-LAPU CITY16HN0095 · ₱5,859,921.60 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. SABANG, DANAO CITY, CEBU20HI0062 · ₱4,752,939.00 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. TUBURAN SUR, DANAO CITY, CEBU20HI0065 · ₱4,752,757.00 · mapped
- LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CANDUMAN, MANDAUE CITY, CEBU20HN0099 · ₱4,702,500.00 · mapped
- CSSP - CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM- ROLL-IT) - TABOK RD. CONNECTING CEBU NORTH HAGNAYA WHARF RD. IN SUPPORT TO FOOD PROCESSING21HN0005 · ₱4,649,263.90 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BRGY. QUIOT, CEBU CITY20HH0041 · ₱2,938,283.29 · mapped
- LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTI-PURPOSE/FACILITIES - REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. UMAPAD, MANDAUE CITY, CEBU20HN0074 · ₱2,374,839.29 · mapped
- CONSTRUCTION OF WATER SYSTEM, LEVEL II, BRGY. MASLOG, DANAO CITY, CEBU20HI0045 · ₱1,950,300.00 · mapped
- CONSTRUCTION OF WATER SYSTEM, LEVEL II, BRGY. SABANG, DANAO CITY, CEBU20HI0047 · ₱1,950,300.00 · mapped
- CONSTRUCTION OF WATER SYSTEM, LEVEL II, BRGY. MANLAYAG, DANAO CITY, CEBU20HI0044 · ₱1,949,310.00 · mapped
- CONSTRUCTION OF WATER SYSTEM, LEVEL II, BRGY. BALIANG, DANAO CITY, CEBU20HI0036 · ₱1,949,310.00 · mapped
- CONSTRUCTION OF WATER SYSTEM, LEVEL II, BRGY. SANDAYONG SUR, DANAO CITY, CEBU20HI0048 · ₱1,949,310.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - BARANGAY ROAD ALONG DUNGGOAN IN SUPPORT OF MITSUMI AND REPUBLIC CEMENT, DANAO CITY, CEBU21HI0017 · ₱1,901,200.00 · mapped
- CONSTRUCTION OF LOCAL ROAD, BRGY. SUBA, DANAO CITY, CEBU20HI0087 · ₱1,862,000.00 · mapped
- CONSTRUCTION OF WATER SYSTEM, LEVEL II, BRGY. LICOS, DANAO CITY, CEBU20HI0043 · ₱1,506,098.76 · mapped
Equipment & capacity
PCAB license
- License no.
- 14881
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Feb 26, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 14881); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
2 evaluations listed across 1 GPPB CPES release; average final rating 90.9% over 2 rated projects; 2 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 9, 2020 | DPWH | ₱59,783,680.00 | Completed | 90.1% | 90.9% | 37th, p. 120 |
| Nov 11, 2019 | DPWH | ₱19,600,000.00 | Completed | 95.0% | 90.9% | 37th, p. 120 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →