Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Schedule / Date Inconsistencies

Completion before start, implausible duration for cost, or future dates marked complete.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23BE0010 (₱29.39M) is recorded as completed in 79 days against 238 planned; similar-cost projects take a median of 239 days, putting it in the fastest 2.7%. The contractor may have deployed extra resources or worked in favorable conditions, allowing for faster completion.

Public record entityConstruction of Fugu Abajo Flood Control System, Tumauini, Isabela
LocationTUMAUINI (ISABELA), ISABELA, Region IIContract 23BE0010
Amount₱29,394,655.71 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Fugu Abajo Flood Control System, Tumauini, Isabela23BE0010Flood control100%November 21, 2023June 15, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 28, 2023 · Source fetched October 21, 2026

Rule Definition

Compares start, target, and actual dates from Sumbong with contract cost.

Triggering Data & citations

Contract schedule fields are inconsistent or implausible

{
  "issues": [
    "implausibly_short_duration"
  ],
  "startDate": "2023-03-28T00:00:00.000Z",
  "contractId": "23BE0010",
  "actualEndDate": "2023-06-15T00:00:00.000Z",
  "targetEndDate": "2023-11-20T00:00:00.000Z",
  "contractCostPhp": 29394655.71
}

Possible Innocent Explanations

  • Revised dates not yet reflected in Sumbong export
  • Early completion certificate vs planned start typo

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaTumauiniFugu Abajo
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Active fault14.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.