Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24BB0085 was awarded at 99.98% of its ABC. Across its 24 recorded contracts, TJMT CONST was awarded at ≥99.5% of ABC 23 times (95.8%), versus 70.4% for flood-control contracts overall. This may reflect highly competitive bidding or precise cost estimation.

Public record entityConstruction of Flood Control at Zone 2, Barsat East, Baggao, Cagayan
LocationBAGGAO (CAGAYAN), CAGAYAN, Region IIContract 24BB0085
Amount₱48,240,000.0099.98% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control at Zone 2, Barsat East, Baggao, Cagayan24BB0085Flood control100%December 12, 2024December 2, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 28, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Cagayan 1st District Engineering Office",
  "ratio": 0.9997927461139896,
  "abcPhp": 48250000,
  "threshold": 0.995,
  "contractId": "24BB0085",
  "contractor": "TJMT CONST",
  "contractCostPhp": 48240000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may reflect highly competitive bidding or precise cost estimation.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanBaggaoBarsat East
Storms whose wind field reached it
Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Active fault12.2 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.