Bid-Ceiling Hugging

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23HO0187 was awarded at 100.00% of its ABC. Across its 88 recorded contracts, QM BUILDERS was awarded at ≥99.5% of ABC 84 times (95.5%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or competitive bidding that exactly matched the ABC.

Public record entityConstruction of Storm Surge Protection Structures at Sitio Guilongsoran, Brgy. Poblacion, Ginatilan, Cebu (Package 1)
LocationGINATILAN (CEBU), CEBU, Region VIIContract 23HO0187
Amount₱96,493,891.72100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Storm Surge Protection Structures at Sitio Guilongsoran, Brgy. Poblacion, Ginatilan, Cebu (Package 1)23HO0187Flood control100%February 19, 2024December 11, 2023—completedsumbong source

Start: April 11, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Cebu 7th District Engineering Office",
  "ratio": 0.9999996246395937,
  "abcPhp": 96493927.94,
  "threshold": 0.995,
  "contractId": "23HO0187",
  "contractor": "QM BUILDERS",
  "contractCostPhp": 96493891.72
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate