Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22GN0001 and 23GN0051 have near-identical descriptions about 743 m apart (funding years 2022, 2023; ₱49.00M, ₱80.09M). Worth checking whether they cover the same works. It is possible that these are sequential or adjacent segments of flood mitigation works along the same river, funded in different years.

Public record entityConstruction of Flood Mitigation Structure along Bago River, Negros Occidental
LocationBAGO CITY (NEGROS OCCIDENTAL), NEGROS OCCIDENTAL, Region VIContract 23GN0051
Amount₱80,094,986.22 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure along Bago River, Negros Occidental23GN0051Flood control100%January 30, 2024February 11, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 11, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23GN0051",
  "fundingYear": 2023,
  "municipality": "BAGO CITY (NEGROS OCCIDENTAL)",
  "distanceMeters": 742.9726539867672,
  "titleSimilarity": 1
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OccidentalCity of BagoLag-Asan
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active fault26.8 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA2 (3.01-4 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.