Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 23BH0102 was awarded at 100.00% of its ABC. Across its 28 recorded contracts, V B MANUBAY CONST was awarded at ≥99.5% of ABC 28 times (100.0%), versus 70.4% for flood-control contracts overall. It is possible that the contractor consistently bids at the maximum allowed amount to maximize revenue while staying within legal limits.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Barangay Minuri Flood Control Structure, Section 3, Jones, Isabela23BH0102Flood control | 100% | March 22, 2024 | September 18, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: May 30, 2023 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Isabela 4th District Engineering Office",
"ratio": 1,
"abcPhp": 96500000,
"threshold": 0.995,
"contractId": "23BH0102",
"contractor": "V B MANUBAY CONST",
"contractCostPhp": 96500000
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
Cite this record
Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Barangay Minuri Flood Control Structure, Section 3, Jones, Isabela.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/66014161-7798-4969-a818-07306c3ea65d
The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.