Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22HK0043 was awarded at 100.00% of its ABC. Across its 19 recorded contracts, PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS was awarded at ≥99.5% of ABC 19 times (100.0%), versus 70.4% for flood-control contracts overall. It is possible that the winning bid was set at the ABC due to a lack of competition or because the ABC was carefully estimated.

Public record entityReconstruction of Tamogong River Control, Bais City, Negros Oriental
LocationBAIS CITY (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VIIContract 22HK0043
Amount₱67,550,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Reconstruction of Tamogong River Control, Bais City, Negros Oriental22HK0043Flood control100%December 7, 2022December 7, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 18, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Negros Oriental 2nd District Engineering Office",
  "ratio": 1,
  "abcPhp": 67550000,
  "threshold": 0.995,
  "contractId": "22HK0043",
  "contractor": "PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS",
  "contractCostPhp": 67550000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalJimalaludEli
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active fault6.9 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)LandslidehighUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.