Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22AD0098 and 24AD0076 have near-identical descriptions about 62 m apart (funding years 2022, 2024; ₱14.70M, ₱48.25M). Worth checking whether they cover the same works. It is possible that the second project is a continuation or expansion of the first, or that additional works were needed after the initial construction.

Public record entityConstruction of Balidbid Flood Control Structure, Salcedo, Ilocos Sur
LocationSALCEDO (BAUGEN) (ILOCOS SUR), ILOCOS SUR, Region IContract 24AD0076
Amount₱48,249,866.90 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Balidbid Flood Control Structure, Salcedo, Ilocos Sur24AD0076Flood control100%November 19, 2024November 15, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 12, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24AD0076",
  "fundingYear": 2024,
  "municipality": "SALCEDO (BAUGEN) (ILOCOS SUR)",
  "distanceMeters": 61.93557414108424,
  "titleSimilarity": 0.9371161876688774
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos SurSalcedoBalidbid
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Active fault13.5 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.