Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24HL0010 was awarded at 100.00% of its ABC. Across its 21 recorded contracts, YPR GEN CONTRACTOR AND CONST SUPPLY INC was awarded at ≥99.5% of ABC 20 times (95.2%), versus 70.4% for flood-control contracts overall. It is possible the contractor consistently bids at the maximum allowed amount to maximize revenue within legal limits.

Public record entityConstruction of Canaway River Control (Downstream A), Siaton, Negros Oriental
LocationSIATON (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VIIContract 24HL0010
Amount₱45,080,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Canaway River Control (Downstream A), Siaton, Negros Oriental24HL0010Flood control100%September 11, 2024September 11, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 20, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Negros Oriental 3rd District Engineering Office",
  "ratio": 1,
  "abcPhp": 45080000,
  "threshold": 0.995,
  "contractId": "24HL0010",
  "contractor": "YPR GEN CONTRACTOR AND CONST SUPPLY INC",
  "contractCostPhp": 45080000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalSiatonSan Jose
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active fault6.9 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)mediumUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA3 (4.01-5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.