Duplicate or Near-Duplicate Projects
Very similar descriptions within ~100m or identical coordinates across contracts/years.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contracts 22AD0101 and 24AD0047 have near-identical descriptions about 2744 m apart (funding years 2022, 2024; ₱28.53M, ₱14.70M). Worth checking whether they cover the same works. It is possible these are two separate flood control structures at different locations within Burgos.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Burgos Flood Control, Burgos, Ilocos Sur22AD0101Flood control | 100% | August 11, 2022 | August 29, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: April 4, 2022 · Source fetched October 21, 2026
Rule Definition
Title similarity + distance or shared coordinates within municipality.
Triggering Data & citations
Similar project description near another contract in the same municipality
{
"contractId": "22AD0101",
"fundingYear": 2022,
"municipality": "BURGOS (ILOCOS SUR)",
"distanceMeters": 2743.932616426113,
"titleSimilarity": 1
}Source documents
Possible Innocent Explanations
- Phased construction seasons
- Upstream/downstream segments recorded separately