Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 5 contracts awarded to DRAGON TWELVE BUILDERS & CONST SUPPLY by the same office started within 0 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 3 in the same municipality. It is possible these are separate legitimate projects in different barangays or along different rivers, all scheduled to start at the same time for efficiency.

Public record entityConstruction of Flood Control Project along Ilagan River, barangay Cabisera 7, City of Ilagan, Isabela
LocationILAGAN CITY (CAPITAL) (ISABELA), ISABELA, Region IIContract 23BE0009
Amount₱48,993,521.45 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Project along Ilagan River, barangay Cabisera 7, City of Ilagan, Isabela23BE0009Flood control100%December 9, 2023June 15, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 2, 2023 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold in one municipality

{
  "deo": "Isabela 1st District Engineering Office",
  "contractId": "23BE0009",
  "contractor": "DRAGON TWELVE BUILDERS & CONST SUPPLY",
  "windowDays": 120,
  "clusterSize": 5,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48993521.45,
  "maxInOneMunicipality": 3
}

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaCity of IlaganCabeseria 7
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Active fault6.3 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.