Love the Philippines

Anomaly / indicator worth examining — not an accusation.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Bid-Ceiling Hugging

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22BH0060 was awarded at 100.00% of its ABC. Across its 28 recorded contracts, V B MANUBAY CONST was awarded at ≥99.5% of ABC 28 times (100.0%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or a lack of competition in the bidding process.

Public record entityConstruction of Flood Control along Ganano River at Batal (Sta. 1+300 - Sta. 1+787), Isabela
LocationCITY OF SANTIAGO (ISABELA), ISABELA, Region IIContract 22BH0060
Amount₱69,479,741.60100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control along Ganano River at Batal (Sta. 1+300 - Sta. 1+787), Isabela22BH0060Flood control100%October 13, 2022October 5, 2022—completedsumbong source

Start: February 17, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Isabela 4th District Engineering Office",
  "ratio": 0.9999962809441565,
  "abcPhp": 69480000,
  "threshold": 0.995,
  "contractId": "22BH0060",
  "contractor": "V B MANUBAY CONST",
  "contractCostPhp": 69479741.6
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate