Bid-Ceiling Hugging
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 24HE0051 was awarded at 100.00% of its ABC. Across its 88 recorded contracts, QM BUILDERS was awarded at ≥99.5% of ABC 84 times (95.5%), versus 70.4% for flood-control contracts overall. It is possible that only one bidder participated, resulting in an award at the ABC.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control along Mananga River (Right Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 2)24HE0051Flood control | 100% | April 10, 2025 | April 10, 2025 | — | completedsumbong source |
Start: February 20, 2024 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Cebu 1st District Engineering Office",
"ratio": 1,
"abcPhp": 144750000,
"threshold": 0.995,
"contractId": "24HE0051",
"contractor": "QM BUILDERS",
"contractCostPhp": 144750000
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate