Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24BH0182 was awarded at 100.00% of its ABC. Across its 36 recorded contracts, DALCON CONST was awarded at ≥99.5% of ABC 35 times (97.2%), versus 70.4% for flood-control contracts overall. This may be due to highly competitive bidding where the winning bid matches the ABC exactly.

Public record entityConstruction of Bautista Flood Control Structure, Section 1, San Agustin, Isabela
LocationSAN AGUSTIN (ISABELA), ISABELA, Region IIContract 24BH0182
Amount₱96,500,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Bautista Flood Control Structure, Section 1, San Agustin, Isabela24BH0182Flood control100%March 25, 2025November 12, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: June 3, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Isabela 4th District Engineering Office",
  "ratio": 1,
  "abcPhp": 96500000,
  "threshold": 0.995,
  "contractId": "24BH0182",
  "contractor": "DALCON CONST",
  "contractCostPhp": 96500000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to highly competitive bidding where the winning bid matches the ABC exactly.

Cite this record

Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Bautista Flood Control Structure, Section 1, San Agustin, Isabela.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/82d6da48-9515-46b4-a519-295f829502b2

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaSan AgustinBautista
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Matmo 2025Mitag 2025Kajiki 2025
Hazard exposure
Active fault30.6 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)LandslidelowUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.