Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 24HH0009 and 23HH0056 have near-identical descriptions about 74 m apart (funding years 2023, 2024; ₱144.59M, ₱44.00M). Worth checking whether they cover the same works. It is possible that the second contract is a continuation or extension of the first project, but this is not labeled in the titles.

Public record entityConstruction of Flood Mitigation Structure along Butuanon River, Barangay Pit-os, Cebu City
LocationCEBU CITY (CAPITAL) (CEBU), CEBU, Region VIIContract 23HH0056
Amount₱43,999,790.93 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure along Butuanon River, Barangay Pit-os, Cebu City23HH0056Flood control100%December 17, 2023December 19, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 20, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23HH0056",
  "coordinates": {
    "lat": 10.391501,
    "lon": 123.92053
  },
  "municipality": "CEBU CITY (CAPITAL) (CEBU)",
  "distanceMeters": 74.11858211549618,
  "titleSimilarity": 1
}

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)City of CebuPit-os
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active fault2.2 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.