Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 4 contracts awarded to DJCM CONST CORP FORMERLY: DJCM CONST by the same office started within 0 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 4 in the same municipality. These contracts may cover separate flood control structures at different sitios and riverbanks within the same municipality, which is common for large-scale flood mitigation projects.

Public record entityConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Right Bank), Barangay Cabittauran, Sitio Baetan 2, Nueva Era, Ilocos Norte
LocationNUEVA ERA (ILOCOS NORTE), ILOCOS NORTE, Region IContract 22AB0092
Amount₱48,999,996.73 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Cabittauran River (Right Bank), Barangay Cabittauran, Sitio Baetan 2, Nueva Era, Ilocos Norte22AB0092Flood control100%October 13, 2022October 13, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 25, 2022 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Ilocos Norte 2nd District Engineering Office",
  "contractId": "22AB0092",
  "contractor": "DJCM CONST CORP FORMERLY: DJCM CONST",
  "windowDays": 120,
  "clusterSize": 4,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48999996.73,
  "averageTitleSimilarity": 0.9499598749038536
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos NorteNueva EraCabittauran
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Active fault0.9 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.