Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22PA0193 and 22PA0362 have near-identical descriptions about 507 m apart (funding year 2022; ₱96.50M, ₱95.56M). Worth checking whether they cover the same works. It is possible these are two phases or segments of a larger flood control project that were not clearly labeled as such.

Public record entityConstruction of Flood Control Structure, Barangay Cardona, Dolores, Abra
LocationDOLORES (ABRA), ABRA, Cordillera Administrative RegionContract 22PA0193
Amount₱96,500,000.00 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure, Barangay Cardona, Dolores, Abra22PA0193Flood control100%April 23, 2023April 21, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: July 20, 2022 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "22PA0193",
  "coordinates": {
    "lat": 17.675047,
    "lon": 120.70529
  },
  "municipality": "DOLORES (ABRA)",
  "distanceMeters": 506.5689788577081,
  "titleSimilarity": 0.9473684210526315
}

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)AbraDolores
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Active fault2.8 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.