Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23BE0035 was awarded at 99.95% of its ABC. Across its 37 recorded contracts, EGB CONST CORP FORMERLY: EGB CONST was awarded at ≥99.5% of ABC 36 times (97.3%), versus 70.4% for flood-control contracts overall. This may be due to consistently competitive bidding that drives prices close to the ABC.

Public record entityConstruction of Flood Mitigation Structure along Cagayan River, Barangay Alibagu, City of Ilagan, Isabela
LocationILAGAN CITY (CAPITAL) (ISABELA), ISABELA, Region IIContract 23BE0035
Amount₱48,975,104.3599.95% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure along Cagayan River, Barangay Alibagu, City of Ilagan, Isabela23BE0035Flood control100%January 24, 2024November 24, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 17, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Isabela 1st District Engineering Office",
  "ratio": 0.9994919255102042,
  "abcPhp": 49000000,
  "threshold": 0.995,
  "contractId": "23BE0035",
  "contractor": "EGB CONST CORP FORMERLY: EGB CONST",
  "contractCostPhp": 48975104.35
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to consistently competitive bidding that drives prices close to the ABC.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaCity of IlaganAlibagu
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Active fault15.7 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)LandslidemediumUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.