Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22BE0055 was awarded at 99.80% of its ABC. Across its 37 recorded contracts, EGB CONST CORP FORMERLY: EGB CONST was awarded at ≥99.5% of ABC 36 times (97.3%), versus 70.4% for flood-control contracts overall. This pattern may result from consistently competitive bidding or precise cost estimation.

Public record entityConstruction of River Control at Oway River below the Dicaruyan-Sapinit Bridge, Barangay Dicaruyan, Divilacan, Isabela
LocationDIVILACAN (ISABELA), ISABELA, Region IIContract 22BE0055
Amount₱4,890,000.0099.80% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of River Control at Oway River below the Dicaruyan-Sapinit Bridge, Barangay Dicaruyan, Divilacan, Isabela22BE0055Flood control100%July 22, 2022July 22, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 7, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Isabela 1st District Engineering Office",
  "ratio": 0.9979591836734694,
  "abcPhp": 4900000,
  "threshold": 0.995,
  "contractId": "22BE0055",
  "contractor": "EGB CONST CORP FORMERLY: EGB CONST",
  "contractCostPhp": 4890000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Cite this record

Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of River Control at Oway River below the Dicaruyan-Sapinit Bridge, Barangay Dicaruyan, Divilacan, Isabela.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/9a403f00-014a-4047-8c11-7dbdd316bd24

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaDivilacanDicaroyan
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Active fault30.9 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.