Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23KE0031 and 24KE0015 have near-identical descriptions about 397 m apart (funding years 2023, 2024; ₱46.94M, ₱9.51M). Worth checking whether they cover the same works. It is possible that the second contract is a continuation or extension of the first project.

Public record entityConstruction of River Control along Alangilan Box Culvert, Camiguin Circumferential Rd, Sagay, Camiguin
LocationSAGAY (CAMIGUIN), CAMIGUIN, Region XContract 23KE0031
Amount₱46,937,543.46 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of River Control along Alangilan Box Culvert, Camiguin Circumferential Rd, Sagay, Camiguin23KE0031Flood control100%December 14, 2023April 30, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 21, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23KE0031",
  "fundingYear": 2023,
  "municipality": "SAGAY (CAMIGUIN)",
  "distanceMeters": 396.5466641767184,
  "titleSimilarity": 0.9620522263140275
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)CamiguinSagayAlangilan
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active fault50.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)lowUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA1 (2.01-3 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.