Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23HO0231 was awarded at 100.00% of its ABC. Across its 88 recorded contracts, QM BUILDERS was awarded at ≥99.5% of ABC 84 times (95.5%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or rounding practices.

Public record entityRepair/ Rehabilitation/ Reconstruction of Damaged Saliring River Flood Control System (Upstream), Malabuyoc, Cebu, Sta. 0+045 to Sta. 0+162
LocationMALABUYOC (CEBU), CEBU, Region VIIContract 23HO0231
Amount₱87,599,384.57100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Repair/ Rehabilitation/ Reconstruction of Damaged Saliring River Flood Control System (Upstream), Malabuyoc, Cebu, Sta. 0+045 to Sta. 0+16223HO0231Flood control100%May 27, 2024May 27, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: August 10, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Cebu 7th District Engineering Office",
  "ratio": 0.9999969669970231,
  "abcPhp": 87599650.26,
  "threshold": 0.995,
  "contractId": "23HO0231",
  "contractor": "QM BUILDERS",
  "contractCostPhp": 87599384.57
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to precise cost estimation or rounding practices.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)CebuMalabuyocBarangay I
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active fault11.1 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated only at SSA4 (>5 m surge)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.