Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24BB0075 was awarded at 99.99% of its ABC. Across its 24 recorded contracts, TJMT CONST was awarded at ≥99.5% of ABC 23 times (95.8%), versus 70.4% for flood-control contracts overall. This may reflect highly competitive bidding or precise cost estimation.

Public record entityConstruction of Flood Control Structure along Cagayan River, Aguigican, Gattaran, Cagayan, Package 3
LocationGATTARAN (CAGAYAN), CAGAYAN, Region IIContract 24BB0075
Amount₱96,490,000.0099.99% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure along Cagayan River, Aguigican, Gattaran, Cagayan, Package 324BB0075Flood control100%March 2, 2025January 24, 2025—completedsumbong source

Start: February 22, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Cagayan 1st District Engineering Office",
  "ratio": 0.9998963730569949,
  "abcPhp": 96500000,
  "threshold": 0.995,
  "contractId": "24BB0075",
  "contractor": "TJMT CONST",
  "contractCostPhp": 96490000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may reflect highly competitive bidding or precise cost estimation.