Schedule / Date Inconsistencies

Completion before start, implausible duration for cost, or future dates marked complete.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24BI0034 (₱144.75M) is recorded as completed in 95 days against 344 planned; similar-cost projects take a median of 377 days, putting it in the fastest 1.3%. The contractor may have deployed unusually large resources or worked in parallel to finish ahead of schedule.

Public record entityConstruction of Flood Control and Drainage Structures (FCDS- Package 5) along Magat River, Bagahabag Section, Solano, Nueva Viscaya
LocationSOLANO (NUEVA VIZCAYA), NUEVA VIZCAYA, Region IIContract 24BI0034
Amount₱144,750,000.00 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control and Drainage Structures (FCDS- Package 5) along Magat River, Bagahabag Section, Solano, Nueva Viscaya24BI0034Flood control100%January 25, 2025May 21, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 16, 2024 · Source fetched October 21, 2026

Rule Definition

Compares start, target, and actual dates from Sumbong with contract cost.

Triggering Data & citations

Contract schedule fields are inconsistent or implausible

{
  "issues": [
    "implausibly_short_duration"
  ],
  "startDate": "2024-02-16T00:00:00.000Z",
  "contractId": "24BI0034",
  "actualEndDate": "2024-05-21T00:00:00.000Z",
  "targetEndDate": "2025-01-24T00:00:00.000Z",
  "contractCostPhp": 144750000
}

Possible Innocent Explanations

  • Revised dates not yet reflected in Sumbong export
  • Early completion certificate vs planned start typo

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)Nueva VizcayaQuezon
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Fengshen 2025Matmo 2025Mitag 2025
Hazard exposure
Active fault16.3 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.