Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 24AA0075 was awarded at 100.00% of its ABC. Across its 22 recorded contracts, BJMJB CONST & SUPPLY was awarded at ≥99.5% of ABC 21 times (95.5%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or competitive bidding that matched the ABC exactly.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Barangay Buyon and Barangay Pasiocan, Bacarra, Ilocos Norte24AA0075Flood control | 100% | August 4, 2024 | April 16, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: February 12, 2024 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Ilocos Norte 1st District Engineering Office",
"ratio": 0.9999995064604856,
"abcPhp": 29399874.94,
"threshold": 0.995,
"contractId": "24AA0075",
"contractor": "BJMJB CONST & SUPPLY",
"contractCostPhp": 29399860.43
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
- This may be due to precise cost estimation or competitive bidding that matched the ABC exactly.
Cite this record
Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Flood Control Structure along Barangay Buyon and Barangay Pasiocan, Bacarra, Ilocos Norte.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/b08cd14d-058c-44a4-99ff-f591adb73f0d
The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.
