Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 14 contracts awarded to 739 BUILDERS by the same office started within 62 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 5 in the same municipality. It is possible that these are separate flood control projects planned for different sites as part of a coordinated flood mitigation program.

Public record entityConstruction of Abang Flood Control Structure (Phase 2), Barangay Abang, Bucay, Abra
LocationBUCAY (ABRA), ABRA, Cordillera Administrative RegionContract 22PA0127
Amount₱49,497,477.49 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Abang Flood Control Structure (Phase 2), Barangay Abang, Bucay, Abra22PA0127Flood control100%January 26, 2023January 26, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: June 15, 2022 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Abra District Engineering Office",
  "contractId": "22PA0127",
  "contractor": "739 BUILDERS",
  "windowDays": 120,
  "clusterSize": 14,
  "thresholdPhp": 50000000,
  "contractCostPhp": 49497477.49,
  "averageTitleSimilarity": 0.8481382823764025
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)AbraBucayAbang
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Active fault0.2 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)LandslidelowUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.