Duplicate or Near-Duplicate Projects
Very similar descriptions within ~100m or identical coordinates across contracts/years.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contracts 23HO0144 and 23HO0163 have near-identical descriptions about 85 m apart (funding year 2023; ₱96.21M, ₱96.40M). Worth checking whether they cover the same works. It is possible these are two segments of the same riverbank, each described with a different barangay as the starting point.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Revetment Wall at Barangay Tupas - Barangay Vive River Flood Control, Ronda, Cebu23HO0163Flood control | 100% | February 19, 2024 | December 19, 2023 | — | completedsumbong source |
Start: April 11, 2023 · Source fetched October 21, 2026
Rule Definition
Title similarity + distance or shared coordinates within municipality.
Triggering Data & citations
Similar project description near another contract in the same municipality
{
"contractId": "23HO0163",
"fundingYear": 2023,
"municipality": "RONDA (CEBU)",
"distanceMeters": 85.20904779692071,
"titleSimilarity": 0.9783505154639175
}Source documents
Possible Innocent Explanations
- Phased construction seasons
- Upstream/downstream segments recorded separately
