Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 5 contracts awarded to DRAGON TWELVE BUILDERS & CONST SUPPLY by the same office started within 0 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 3 in the same municipality. It is common for flood control projects to be split across different rivers and barangays within a district for logistical or engineering reasons.

Public record entityConstruction of Flood Mitigation Structure along Cagayan River-Phase II, Barangay Bagutari, Sto. Tomas, Isabela
LocationSANTO TOMAS (ISABELA), ISABELA, Region IIContract 23BE0006
Amount₱48,993,926.88 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure along Cagayan River-Phase II, Barangay Bagutari, Sto. Tomas, Isabela23BE0006Flood control100%December 9, 2023August 19, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 2, 2023 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold in one municipality

{
  "deo": "Isabela 1st District Engineering Office",
  "contractId": "23BE0006",
  "contractor": "DRAGON TWELVE BUILDERS & CONST SUPPLY",
  "windowDays": 120,
  "clusterSize": 5,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48993926.88,
  "maxInOneMunicipality": 3
}

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaSanto TomasBagutari
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Active fault10.6 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.