Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23LC0071 and 24LC0073 have near-identical descriptions about 294 m apart (funding years 2023, 2024; ₱148.47M, ₱148.50M). Worth checking whether they cover the same works. It is possible that the second project is a continuation or extension of the first phase, but this is not clearly labeled in the titles.

Public record entityConstruction of Flood Control Structure along Hijo River, Brgy. Madaum, Tagum City, Davao del Norte
LocationCITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE), DAVAO DEL NORTE, Region XIContract 24LC0073
Amount₱148,499,998.40 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure along Hijo River, Brgy. Madaum, Tagum City, Davao del Norte24LC0073Flood control100%February 15, 2025December 4, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 2, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24LC0073",
  "coordinates": {
    "lat": 7.36585,
    "lon": 125.83427
  },
  "municipality": "CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)",
  "distanceMeters": 294.1651224319478,
  "titleSimilarity": 0.8866995073891626
}

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao del NorteCity of Tagum
Storms whose wind field reached it
Koto 2025Jelawat 2023
Hazard exposure
Active fault17.5 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA1 (2.01-3 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.