Duplicate or Near-Duplicate Projects
Very similar descriptions within ~100m or identical coordinates across contracts/years.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contracts 24KL0011 and 24KL0012 have near-identical descriptions about 163 m apart (funding year 2024; ₱96.50M, ₱96.50M). Worth checking whether they cover the same works. This may be a multi-package project where one contract was not labeled as a package.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Left Bank of Pugaan River, Downstream of Sta. Ana Bridge (Package 2), Tagoloan, Misamis Oriental24KL0012Flood control | 100% | November 25, 2024 | November 25, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: February 5, 2024 · Source fetched October 21, 2026
Rule Definition
Title similarity + distance or shared coordinates within municipality.
Triggering Data & citations
Similar project description near another contract in the same municipality
{
"contractId": "24KL0012",
"fundingYear": 2024,
"municipality": "TAGOLOAN (MISAMIS ORIENTAL)",
"distanceMeters": 163.16393433742684,
"titleSimilarity": 0.9654031630801141
}Source documents
Possible Innocent Explanations
- Phased construction seasons
- Upstream/downstream segments recorded separately