Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23BC0066 was awarded at 100.00% of its ABC. Across its 24 recorded contracts, TJMT CONST was awarded at ≥99.5% of ABC 23 times (95.8%), versus 70.4% for flood-control contracts overall. It is possible that the winning bid simply matched the ABC exactly, which is allowed but rare.

Public record entityConstruction of Dugo Flood Control along Abulug River, Abulug, Cagayan
LocationABULUG (CAGAYAN), CAGAYAN, Region IIContract 23BC0066
Amount₱67,550,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Dugo Flood Control along Abulug River, Abulug, Cagayan23BC0066Flood control100%October 18, 2023August 22, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 20, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Cagayan 2nd District Engineering Office",
  "ratio": 1,
  "abcPhp": 67550000,
  "threshold": 0.995,
  "contractId": "23BC0066",
  "contractor": "TJMT CONST",
  "contractCostPhp": 67550000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanAbulugBanguian
Storms whose wind field reached it
Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Active fault31.6 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.