Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 21HO0002 was awarded at 100.00% of its ABC. Across its 88 recorded contracts, QM BUILDERS was awarded at ≥99.5% of ABC 84 times (95.5%), versus 70.4% for flood-control contracts overall. It is possible that the contractor bid exactly at the ABC to maximize their chance of winning, which is allowed as long as it does not exceed the ABC.

Public record entityConstruction of Tapon-Tangil Seawall, Dumanjug, Cebu
LocationCEBU, Region VIIContract 21HO0002
Amount₱29,398,308.79100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Tapon-Tangil Seawall, Dumanjug, Cebu21HO0002Flood control100%October 8, 2022October 8, 2022—completedsumbong source

Start: March 23, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Cebu 2nd District Engineering Office",
  "ratio": 1,
  "abcPhp": 29398308.79,
  "threshold": 0.995,
  "contractId": "21HO0002",
  "contractor": "QM BUILDERS",
  "contractCostPhp": 29398308.79
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate