Duplicate or Near-Duplicate Projects
Very similar descriptions within ~100m or identical coordinates across contracts/years.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contracts 24N00088 and 23N00119 have near-identical descriptions about 90 m apart (funding years 2023, 2024; ₱193.00M, ₱113.87M). Worth checking whether they cover the same works. It is possible that the second contract is a continuation or expansion of the first project, or that additional funding was required for the same site in a new fiscal year.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Rehabilitation of Bank Protection Structure along Taguibo River Protecting Taguibo Dam Water-Filtration Facilities, Package 2, Barangay Anticala, Butuan City, Agusan del Norte23N00119Flood control | 100% | March 26, 2024 | March 12, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: April 17, 2023 · Source fetched October 21, 2026
Rule Definition
Title similarity + distance or shared coordinates within municipality.
Triggering Data & citations
Similar project description near another contract in the same municipality
{
"contractId": "23N00119",
"fundingYear": 2023,
"municipality": "BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE)",
"distanceMeters": 90.4873516184693,
"titleSimilarity": 1
}Source documents
Possible Innocent Explanations
- Phased construction seasons
- Upstream/downstream segments recorded separately