Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24BH0211 was awarded at 100.00% of its ABC. Across its 37 recorded contracts, EGB CONST CORP FORMERLY: EGB CONST was awarded at ≥99.5% of ABC 36 times (97.3%), versus 70.4% for flood-control contracts overall. It is possible that the bid was calculated to exactly match the ABC to maximize the allowed budget.

Public record entityConstruction of Dipangit Flood Control Structure, Section 4, Jones, Isabela
LocationJONES (ISABELA), ISABELA, Region IIContract 24BH0211
Amount₱96,500,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Dipangit Flood Control Structure, Section 4, Jones, Isabela24BH0211Flood control100%April 16, 2025November 11, 2024—completedsumbong source

Start: June 19, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Isabela 4th District Engineering Office",
  "ratio": 1,
  "abcPhp": 96500000,
  "threshold": 0.995,
  "contractId": "24BH0211",
  "contractor": "EGB CONST CORP FORMERLY: EGB CONST",
  "contractCostPhp": 96500000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate