Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 23HO0194 was awarded at 100.00% of its ABC. Across its 88 recorded contracts, QM BUILDERS was awarded at ≥99.5% of ABC 84 times (95.5%), versus 70.4% for flood-control contracts overall. It is possible that the winning bid was calculated to exactly match the ABC, which is allowed as long as it does not exceed it.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Storm Surge Protection Structures at Sitio Lutak, Brgy. Guiwanon, Ginatilan, Cebu (Package 1)23HO0194Flood control | 100% | November 13, 2023 | November 13, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: April 11, 2023 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Cebu 7th District Engineering Office",
"ratio": 0.9999993978836866,
"abcPhp": 48993856.08,
"threshold": 0.995,
"contractId": "23HO0194",
"contractor": "QM BUILDERS",
"contractCostPhp": 48993826.58
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
Cite this record
Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Storm Surge Protection Structures at Sitio Lutak, Brgy. Guiwanon, Ginatilan, Cebu (Package 1).” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/dcb99173-15b2-4600-ab8e-a1126203a332
The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.