Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 4 contracts awarded to DJCM CONST CORP FORMERLY: DJCM CONST by the same office started within 0 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 4 in the same municipality. These may be separate flood control structures at different sitios and rivers within the same municipality, each requiring its own contract.

Public record entityConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Lading River, Barangay Caray, Sitio Lading 2, Nueva Era, Ilocos Norte
LocationNUEVA ERA (ILOCOS NORTE), ILOCOS NORTE, Region IContract 22AB0099
Amount₱48,999,997.76 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0

Start: March 25, 2022 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Ilocos Norte 2nd District Engineering Office",
  "contractId": "22AB0099",
  "contractor": "DJCM CONST CORP FORMERLY: DJCM CONST",
  "windowDays": 120,
  "clusterSize": 4,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48999997.76,
  "averageTitleSimilarity": 0.9499598749038536
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program